Modifying the Target Chamber
Target Area Operations technicians Anthony Ybarra and Sky Marshall enter the NIF Target Chamber on the Target Chamber Service System lift during a Facility Maintenance and Reconfiguration period. Their task was to modify the first wall panels at the polar diagnostic instrument manipulator (DIM) to provide the DIM with a greater range of motion. Credit: James Pryatel
Download hi-res image